Skip to content

Trip planning: from order to money

Updated:

Plan trip orders: vehicle blocks, duties, staffing, issuing and sending invoices.

Open Trip planning in Fiatto
In this article

Under Trip planning (/dashboard/ritten) you plan trip orders with a time window and a from/to location — the foundation for vehicle blocks, duties and staffing. Enable the module first via Settings → Data & compliance, Modules block (besides the subscription). At the top you jump to Day overview, Planning board, Duties, Staffing, Planning ↔ money, Rate card, Reality & work orders and Weekly templates (contract transport).

Steps

  1. Enter orders: New order, Import CSV, or roll out weekly templates for contract transport with Roll out.
  2. On the Planning board, click Generate blocks (with turnaround and deadhead time) and assign vehicles.
  3. Click Cut duties according to your rules (max duty and driving time, breaks, rest time, relief points and optionally a Split gap for split peak duties) — conservative defaults, explicitly no collective-agreement judgement.
  4. Staff the week with a Week proposal, correct manually and click Establish week. If an established week still has a shortage, you start a prefilled hiring request from there (nothing is submitted).
  5. Turn planning into money under Planning ↔ money: Issue invoices turns driven, priced trips straight into issued invoices, Send issued invoices emails them with PDF and view link, and Propose hours (established week) creates draft time entries.

Tips

  • Cancel trips with Cancel (trip) instead of deleting — history stays; an invoiced trip is locked.
  • A customer who wants Peppol or a portal is skipped by the send button. If automatic delivery is on, issued invoices go out through the customer's channel by themselves.
  • Reality & work orders: compare the customer plan (CSV, changes nothing), turn open work orders into orders and load travel times per route.
  • The Rate card (customer × vehicle class) prices new orders; a manual price always wins.
  • Public transport timetable and depots: Blocks and timetable; road haulage: shipments; individual orders: work orders.
  • Regenerating blocks or duties first counts what would be lost (duties, vehicle assignments, staffing) and then asks for confirmation; vehicles move to the new block with the most shared orders. In a confirmed week with staffing this is not possible until that week is reopened.
  • If you put a vehicle that is not roadworthy on a block (for example an expired MOT or a blocking defect), Fiatto asks for a justification, which goes into the audit log.
  • Signals in Actions report Completed rides not invoiced (still without an invoice a week after the ride date) and Hiring needed for ride planning (structurally unstaffed duties in a confirmed week, with a pre-filled purchase request).
  • Per date or per block you download the Run sheet (PDF): per block the rides in driving order, with vehicle, duties and driver. The driver also sees his established ride duties with the run sheet on his duty card; one link per driver shows both his public-transport and his ride duties. After generating, the planning board reports the lower bound: fewer vehicles than rides running at the same time is never possible.
Was this article helpful?
View all articles in this topic

Find another answer

A task, feature or short question is enough.