Trip planning: from order to money
Updated:
Plan trip orders: vehicle blocks, duties, staffing, issuing and sending invoices.
Open Trip planning in FiattoIn this article
Under Trip planning (/dashboard/ritten) you plan trip orders with a time window and a from/to location — the foundation for vehicle blocks, duties and staffing. Enable the module first via Settings → Data & compliance, Modules block (besides the subscription). At the top you jump to Day overview, Planning board, Duties, Staffing, Planning ↔ money, Rate card, Reality & work orders and Weekly templates (contract transport).
Steps
- Enter orders: New order, Import CSV, or roll out weekly templates for contract transport with Roll out.
- On the Planning board, click Generate blocks (with turnaround and deadhead time) and assign vehicles.
- Click Cut duties according to your rules (max duty and driving time, breaks, rest time, relief points and optionally a Split gap for split peak duties) — conservative defaults, explicitly no collective-agreement judgement.
- Staff the week with a Week proposal, correct manually and click Establish week. If an established week still has a shortage, you start a prefilled hiring request from there (nothing is submitted).
- Turn planning into money under Planning ↔ money: Issue invoices turns driven, priced trips straight into issued invoices, Send issued invoices emails them with PDF and view link, and Propose hours (established week) creates draft time entries.
Tips
- Cancel trips with Cancel (trip) instead of deleting — history stays; an invoiced trip is locked.
- A customer who wants Peppol or a portal is skipped by the send button. If automatic delivery is on, issued invoices go out through the customer's channel by themselves.
- Reality & work orders: compare the customer plan (CSV, changes nothing), turn open work orders into orders and load travel times per route.
- The Rate card (customer × vehicle class) prices new orders; a manual price always wins.
- Public transport timetable and depots: Blocks and timetable; road haulage: shipments; individual orders: work orders.
- Regenerating blocks or duties first counts what would be lost (duties, vehicle assignments, staffing) and then asks for confirmation; vehicles move to the new block with the most shared orders. In a confirmed week with staffing this is not possible until that week is reopened.
- If you put a vehicle that is not roadworthy on a block (for example an expired MOT or a blocking defect), Fiatto asks for a justification, which goes into the audit log.
- Signals in Actions report Completed rides not invoiced (still without an invoice a week after the ride date) and Hiring needed for ride planning (structurally unstaffed duties in a confirmed week, with a pre-filled purchase request).
- Per date or per block you download the Run sheet (PDF): per block the rides in driving order, with vehicle, duties and driver. The driver also sees his established ride duties with the run sheet on his duty card; one link per driver shows both his public-transport and his ride duties. After generating, the planning board reports the lower bound: fewer vehicles than rides running at the same time is never possible.