Portfolio intake: from idea to project
Updated:
Funnel from candidate to approved project.
Open Portfolio intake in FiattoIn this article
Under Projects & production → Portfolio intake (/dashboard/projecten/intake) you manage candidates before they become a running project — with scoring, strategic goals and a feasibility check on capacity and cash.
Steps
- Click Register candidate and fill in Name, Class (Strategic, Growth, Maintenance or Mandatory/regulatory), Expected benefits (€), Planned cost (€), the window Desired from/Desired until and Requested (h/wk); optionally link a Goal from the Strategic goals.
- Set up the weighted criteria under Scoring criteria (or Load default template) and set a Cutoff score (above/below the line); score a candidate with Score. The score is the weighted average (0-100) and is coloured above/below the line.
- Click Decide: the feasibility check combines the capacity view (hard bench in the requested window, provisional allocation does not count) with the cash check (13-week forecast). If provisional reservations make a difference, the bench including those reservations is shown as an extra line. If there is a shortfall, the button asks for a second click. The decision screen also shows the Post-calculation of closed projects and Lessons from similar projects.
- Approve → In preparation turns the candidate into a project with status In preparation and immediately freezes the business case (approvers only; otherwise freeze it later on the project); Reject cancels it. Then track the project on Portfolio health.
Tips
- A programme is linked only after approval, from Programs; intake only knows goals.
- Candidates (Idea/Proposal) do not belong on the health board.
- What-if scenario can simulate a candidate with Candidate proceeds, without saving anything.