Building elements, inspection plan and faults per building
Updated:
The element and installation register, the inspection plan with the missing status, and fault reports via a QR sticker.
Open Buildings in FiattoIn this article
In the building dossier (Assets & property → Buildings, /dashboard/gebouwen) you keep track, per building, of its elements and installations, which inspections are required and which faults users report.
Steps
- On the Maintenance & rent tab, under Building elements and installations, record the elements with Add: NL-SfB code, name, Year installed and Quantity with Unit. If the elements are already in the MJOP as free text, click Take over from MJOP. On an MJOP task you then choose the Element from register.
- On Documents & inspections, in the Inspection plan, set per inspection whether it is Default, Required or N/A (with a reason), optionally with your own Interval (months). Per inspection you see Compliant, Expiring, Expired, Missing or To assess.
- On Work orders, under QR sticker: report a fault, create the code with Create fault QR code and put it up in the building. Users can then report a fault without logging in.
- Handle the reports under Faults: Schedule creates a work order with the building's work address, Open work order takes you there, and you close a report with Resolved or Dismiss. You can link a report or warranty to an element.
Tips
- Without your own choice, only the electrical installation (NEN 3140) is required for a non-residential building; the intervals are indicative. A required inspection without a valid report raises the signal Required inspection missing in the status strip, the cockpit and Actions.
- Fiatto stores only a hash of the fault QR code. To print an active code again, renew it; the old sticker then stops working.
- An element with linked MJOP tasks, faults or warranties can only be deleted after unlinking.
- See also building dossier and work orders.