Handover and subcontractors
Updated:
Snag items through to acceptance, subcontractors and their performance, and a signed handover file per work package.
Open Projects in FiattoIn this article
Under Projects → All project tools → Handover and subcontractors (/dashboard/projecten/oplevering) you manage, per project, the subcontractors and their performance, the snag items through to acceptance and, per work package, a handover with a recorded evidence file. You need write access to projects.
Steps
- Under Subcontractors and performance, link a supplier to a work package (Link a subcontractor). If you want them to take part themselves, choose Create portal link under Portal for subcontractors: with that link they only see their own snag items and report them fixed.
- Record snag items with Record a snag item (description, location, severity and fix date) and add photos where needed (Add photo). The site lead or subcontractor clicks Report fixed; a colleague clicks Accept or Reject. Whoever reports fixed does not accept their own item.
- Create a handover per work package (Create a handover), optionally as evidence for an instalment, and open the file (Go to signing).
- Sign with the name under Signed on behalf of the client by and Sign and record, or put the handover to the client in the customer portal with Send to the client for signature. Remaining items may stay open and go into the handover report; blocking items must be accepted first.
Tips
- When signing, Fiatto records the Handover file and locks it, with a Fingerprint (sha256). Download the report with photos via Download PDF; after signing it is sent automatically to the email address of the customer portal link.
- Subcontractors get an email for a new or rejected snag item. Through the customer portal the client can accept or reject items reported fixed and report items themselves.
- How far a subcontractor has got follows from the measurements of their work packages, see quantities and progress.
- When every work package of an asset construction project has a signed handover, Fiatto prepares a capitalization proposal, see CAPEX versus sales project.